PhD, Structural Engineering : IIT Delhi (2013)
M. Tech., Structural Engineering : NIT Kurukshetra (2007)
AMIE, Civil Engineering : The Institution of Engineers (India), 2003
GATE 2005 : Qualified
Research Area : Static and Dynamic stability Analysis of Concrete Structures

Research Publications

National Publication

  • Mamta R. Sharma; Arbind K. Singh; Gurmail S. Benipal

    Nonlinear Elastodynamics of Concrete Water Tanks with Shaft-Type Staging, The Indian Concrete Journal, Vol. 87, No. 2, pp. 47-60 (2013)
  • Mamta R. Sharma; Arbind K. Singh; Gurmail S. Benipal

    Static and Dynamic Stability of Elastic Masonry Beam-Columns”, The Indian Concrete Journal, Vol.90, No. 2, pp 48-59, Dec 2016, http://icjonline.com/main_2016.12_Dec_List_n_Abstracts.htm

International Publications

  • Mamta R. Sharma; Arbind K. Singh; Gurmail S. Benipal

    Stability of concrete beam-columns under follower forces”, Latin American Journal of Solids and Structures (LAJSS), Vol. 11, No. 5, pp. 790-809, 2014
  • Mamta R. Sharma; Arbind K. Singh; Gurmail S. Benipal

    Parametric Resonance of Concrete Beam-Columns under Pulsating Axial Force, Latin American Journal of Solids and Structures (LAJSS), Vol. 11, No. 6, pp. 925-945, 2014
  • Mamta R. Sharma; Arbind K. Singh; Gurmail S. Benipal

    Elastic Stability of Concrete Beam-Columns”, Part I: Static Stability, International Journal of Structural Stability and Dynamics (IJSSD), Vol 17, No. 1, pp1750094-1 -1750094-18, Jan 2017, DOI: 10.1142/S0219455417500948
  • Mamta R. Sharma; Arbind K. Singh; Gurmail S. Benipal

    Elastic Stability of Concrete Beam-Columns, Part II: Dynamic Stability, International Journal of Structural Stability and Dynamics (IJSSD), Vol.17, No.1, pp1750095-1 -1750095-20, Jan 2017 DOI: 10.1142/S021945541750095X

International Conferences

  • Mamta R. Sharma; Arbind K. Singh; Gurmail S. Benipal

    Elastic Stability Analysis of Flanged Concrete Columns, Proc., 55th Congress of Indian Society of Theoretical and Applied Mechanics (An International Meet), December 18-21, NIT Hamirpur, (India), pp. 169-175 (2010).
  • Mamta R. Sharma; Arbind K. Singh; Gurmail S. Benipal

    Small Nonlinear Elastic Lateral Vibrations of Flanged Concrete Columns, Proc., Int. Conf. on Structural Stability and Dynamics (ICSSD), January 2012, MNIT Jaipur (Rajasthan) India and Texas A&M University, USA, pp. 825-831 (2012)
  • Mamta R. Sharma; Arbind K. Singh; Gurmail S. Benipal

    Stability of Highly Damped Concrete Beam-Columns, Advances in Structural Engineering , Materials Volume three, Springer India, Structural Engineering Convention pp. 2355-2370, 2014 Print ISBN: 978-81-322-2186-9 Online ISBN: 978-81-322-2187-6 DOI: 10.1007/978-81-322-2187-6_179

Academic Experience

  • Institute of Infrastructure, Technology, Research and Management, Ahmedabad

    Assistant Professor, Department of Civil Engineering : Since April, 2016
  • MVN University, Palwal, Haryana

    Associate Professor and Head of Department of Civil Engineering, - August 2015 - March 2016
  • Lingaya's University, Faridabad, Haryana

    Associate Professor and Dean, School of Civil Engineering : August, 2014 - July 2015

Aministrative Experience

  • Lingaya's University, Faridabad, Haryana

    Monitoring of School of Civil Engineering, BOS, Academic Council, NAAC and organized Expert lectures, etc.,
  • MVN University, Palwal, Haryana

    Monitoring of Civil Engineering Department, BOS, DRC and organized Expert lectures etc.

Skills and Training

  • PROGRAMMING SKILL

    Matlab programming, C, Fortran
  • Computer Skills

    MS Word, Excel, Power Point Operating system: MS Office, STAAD Pro, AUTO CAD
  • Training and Workshops

    • Two weeks training in STAAD Pro, organizing by Civil Engineering Department, NIT Kurukshetra in 2006. • Three months training in Auto CAD from Arena. • 3 days workshop on MS PROJECT SOFTWARE. • Two weeks training in STAAD Pro, Organizing by Civil Engineering Department, IIT Delhi, 2010. • Four weeks training in Matlab Programming, organizing by Civil Engineering Department, IIT Delhi, 2011.

Professional Experience

ICCS Ltd. (LNJ BHILWARA ENERGY), NOIDA

  • UPPER MANGLAD SHEP (5MW)

    • Preparation of Bill of Quantities & Abstract of cost for Detailed Project Report of Civil works. • Preparation of DPR drawings. • Preparation of Design Basis Report of the project. • Preparation of General Layout of the project. • Planning and Hydraulic and structural Design of Broad Crested weir including spillway, undersluice, impermeable floor, cuttoff key upstream and downstream. • Hydraulic and Structural Design of Intake including piers, devide wall, Feeder duct for intake, Desilting basin, tunnel intake portal, tunnel, power duct, forbay. • Design of Box culvert. • Design of penstock liner thickness, Anchor blocks, Expansion joints, saddle support. • Structural analysis and design of power house including service bay, unit bay. • Hydraulic and structural design of tail race duct. • Preparation of Construction drawings including outline and structural drawings. • Planning and general Layout of roads, and preparation of drawings of roads. • Analysis and Design of truss.
  • LATA TAPOVAN HEP (3X57 MW)

    • Preparation of tender drawings. • Check for Hydraulic design of Barrage discharging capacity, cuttoff walls, desilting basin, pressure shaft and head loss etc. • Preparation of Bill of Quantities for complete civil works of project including barrage, desilting basin, HRT, Edits, ventilation tunnels, access tunnel, bus duct tunnels, Surge Shafts, power house cavern, draft tubes, transformer/GIS cavern, TRT and TRT gallery etc. • Preparation of design note. • Design of EOT crane girder and corbels and columns.
  • BALEPHI HEP (NEPAL)( 50 MW)

    • Hydraulic design of barrage including radial gated spillway, undersluice, impermeable floor etc. • Alternative Hydraulic design of weir, spillway, undersluice, impermeable floor, intake etc • Calculation of hydraulic jump, design of u/s and d/s cutt off key, stilling basin. • Hydraulic Design of intake piers, desilting basin, flood protection wall etc. • Preparation of Bill of quantities and abstract of cost of complete project for DPR. • Design of economic diameter of head race tunnel, penstock, design of rockbolts etc. • Design of retaining wall. • Preparation of drawings for DPR. • Preparation of drawings for different alternatives.
  • LIKHU HEP (NEPAL) (3X40 MW)

    • Hydraulic design of desilting tank. • Preparation of drawings of Dam. • Check the stability of coffer dam. • Calculation of discharging capacity of undersluice. • Preparation of alternatives.
  • TIMBI SHEP (2X1.5 MW)

    a. Preparation of construction Drawings of diversion weir, forebay, penstock and anchor blocks. b. Hydraulic design of water conductor system. c. Preparation of construction Drawings of spillway, power duct etc.
  • KURMI SHEP (2x2.5 MW)

    • Preparation of general Layout of different alternatives. • Preparation of BOQ of two different alternatives surface as well as sub surface. • Preparation of layout for roads. • Preparation of detailed project report. • Preparation of drawings of two alternatives for DPR.
  • BALSIO POWER PROJECT (8MW)

    • Preparation of Planning and general layout of the project.

OMAXE CONSTRUCTION LTD. (NEW DELHI)

  • Tendering, MIS

    • Preparation of Tender Document. • Preparation of Bill of Quantities & Abstract of cost tentatively for tender documents. • Monitoring of Management Information System (MIS)